Battery Asset Management UK & Ireland is part of the Informa Markets Division of Informa PLC
This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

13 - 14 October 2026

Leonardo Royal Hotel St Paul's, London, UK

Cap, Floor, and the Future of Long Duration Storage

Date & Time October 13, 2026
9:05 AM - 9:20 AM
Type Presentation

Great Britain’s first Long Duration Electricity Storage (LDES) cap and floor scheme has reached its Minded to Decision stage, and Ofgem is at the heart of one of the most significant regulatory move for the storage sector. This keynote will walk through the regulator’s rationale for the 16 projects provisionally selected, covering pumped storage hydro, compressed air, lithium ion and vanadium flow batteries, and explain what a roughly 7.65GW LDES portfolio actually means for a grid increasingly reliant on renewables and vulnerable to extended periods of low wind and solar generation.

Speaker